BTM/2P/350/2500/M/G Double Pillar Mobile Tote Bin Tipper This Double Pillar Mobile Tote Bin Tipper that is designed to lift and tip either a 200 or 300 Litre Tote Bin at a discharge height of 2500mm. The Mobile Tote Bin Tipper is constructed from Grade 304 stainless steel and is designed to be mobile on castors using the existing guide rail to locate the mobile tote bin tipper. The lifting is accomplished via chains driven by a motor gearbox mounted at the top of the one column with a crossover shaft to the other column. Safety Guard to BS EN 14120:2015 Safety of Machinery Guards The safety guard is constructed from 40 x 40 x 3mm stainless steel box section and 3mm wire, 40mm aperture stainless steel weld mesh to meet the guidelines of BS EN 14120:2015 Safety of Machinery Guards. It encloses the Mobile Tote Bin Tipper to a height of 2500mm on the tipping side and 3500mm elsewhere. There are a pair of hinged doors through which the tote bin is loaded which are electrically and mechanically interlocked preventing the mobile tote bin tipper from operating when a door is open. Additionally, the guard doors can only be opened when the lift carriage is at the full down position to prevent access whilst a load is raised. There will be a pair of guide rail roller assemblies fixed to the outside of the safety guard which will locate onto the existing rail to guide the Mobile Tote Bin Tipper as it is moved. Mobile Tote Bin Tipper Electrical Control This Mobile Tote Bin Tipper is fitted with an IP65 Stainless Steel Control Panel which is mounted on the safety guard at a convenient position to give good maintenance access under the Provision and Use of Work Equipment Regulation 1998 (PUWER). The control panel incorporates the following controls; Up, Down, Guard Release, Emergency Stop and a Reset Facility. Upper and Lower end of travel limit switches are positioned to prevent inadvertent adjustment or damage but are easily adjustable by trained personnel for fine adjustment on site. The mobile tote bin tipper operation is latched so that pressing the ‘Up’ push button once will raise the lift to the full tip position. Once the product has been discharged, pressing the ‘Down’ push button once will return the machine to the full down position. The control panel has a volt free pair of contacts which can be used to connect a ‘Call to Run’ signal if required.
|